国产一区日韩二区欧美三区,动漫国产精品一区二区三区啊啊,日韩无码视频网址,最近最新中文字幕精品视频免费版

    <u id="eznr4"><address id="eznr4"></address></u>
      1. Hotline
        400-850-9596

        News current:home > News > Preparation stage for testing and precautions during the testing process
        Preparation stage for testing and precautions during the testing process

        Preparation stage for testing and precautions during the testing process
        What are the examination methods, assessment applications, and assessment evaluations for on-site experiments in the new version of the "Qualification Accreditation Review Criteria"?
        CMA on-site test assessment method
        On site testing and assessment of inspection and testing institutions can be carried out through witness testing, blind sample assessment, and operational demonstrations; Personnel comparison, instrument comparison, and sample retesting can also be adopted. The sample sources include those provided by the review team and those provided by the inspection and testing agency.
        Application of CMA on-site test assessment results
        In principle, all original records and necessary inspection and testing reports must be provided for on-site testing, except for operation demonstrations; When using electronic records, attention should be paid to the accuracy, completeness, and security of electronic data. In on-site assessment, if the result data is unsatisfactory, the inspection and testing agency should be requested to analyze the reasons; If it is due to accidental reasons, inspection and testing institutions can be arranged to retest; If it belongs to system deviation, it should be considered that the inspection and testing institution does not have the ability to conduct the inspection and testing.
        Evaluation of CMA on-site testing
        After the on-site test is completed, the review team should evaluate the results of the test, including whether the inspection and testing methods used are correct; Check whether the expression of test data and results is standardized and clear; Whether the inspection and testing personnel have the corresponding inspection and testing capabilities; The suitability of environmental facilities; Whether the collection, identification, distribution, circulation, preparation, preservation, and disposal of samples are standardized; Check whether the debugging and use of testing equipment and testing systems are correct; Check whether the inspection and testing records are standardized, etc; The review team provides an overall evaluation conclusion in the on-site assessment project table.

        the previous:Performance, Types, and Antibacterial Effect Evaluation of Plastic Antibacterial Agents next:Nylon family in engineering plastics
        Go top